Epoxy for Bathroom Bolt Replacement
From Advance Coatings Wiki
This is a quick usage of epoxy to put new bolts into a tiled bathroom floor. This is a small project, but these tips/techniques can apply to larger usage of the epoxy.
Overview
The toilet has four bolts. Two on the back, and two on the bottom. The two bottom bolts have rusted out over time. The two back bolts are still intact. The goal will be to remove the toilet from the floor, drill new holes into the floor, set new bolts in epoxy, let them cure overnight, then reattach the toilet to the room and plumbing.
Concerns:
- The old bolts will be rusted, only until they go into the floor, at which point they will be solid bolts.
- Replacement of the tile is not practical.
- The new bolts must be inset strong enough to keep the toilet from moving.
Work Log
(temp notes) toilet removed area cleaned items purchased holes drilled in floor measurement of bolts (determined 2" bolts, not 1.5" were necessary) first cure of epoxy (clean any overpour with acetone) testing of bolts for strenght second cure of epoxy (some soaked in below tile, during first cure) replacement of toilet wait for full cure (at least overnight) attachment of washer + nut tighten 'handtight', then finish with a few turns (not too many) with wrench. cleanup job complete